Rio Antirio Bridge Construction
Rio antirio bridge construction The rion antirrion bridge or official bridge charilaos trikoupis is a cable stayed bridge completed in 2004 between rio and antirrio.
Rio antirio bridge construction. The rio antirrio bridge greek. Rio antirrio bridge is a motorway bridge freeway bridge multiple span cable stayed bridge cable stayed bridge with semi fan system and steel reinforced concrete composite bridge that was built from 1999 until 2004. Rethymno guide 1 037 176 views 50 14. The lead contractor called gefyra sa was a consortium of french based vinci and several greek companies.
The main bridge which is a multi span cable stayed bridge 2 252 meter long with a span distribution equal to 286m 560m 560m 560m 286m. The experts believe that the total amount of funds the bridge s construction will bring to the area will be more than one billion euros during the period 2017 2032. Rion antirion bridge is a technology and engineering masterpiece that contributes to economic development on both sides of the strait of corinth. Trouble with cable links edit on 28 january 2005 six months after the opening of the bridge one of the cable links of the bridge snapped from the top of the m1 pylon and came crashing down on the deck.
Two approach viaducts with 392 meters on rion side composite deck and 239 meters on antirion side prestressed simple supported beams. The peloponnese and mainland greece. Formerly crossing the strait required the use of supply vessels and ferries and 45 minutes.